Jordi Marcè
cronology
- Amador Masterplan , Panama.
- Amador's Masterplan, Panama.
- Arcos business country club.
- Balneario Jafre. Girona
- Barranco Resort. Vilaplana
- Beach Resort. Panama
- Bungalows. Algeria
- Cala del Pi Resort
- Calonge-Sant Antoni Resort.Girona
- Castell Montgrí Campsite - outdoor space
- Castell Montgrí Campsite - restaurants
- Commercial Park. Panama
- Conceptualization Altos de Batele
- Eco-Resort-Park.Puigcerdà
- Equestrian Center. Granada
- Formation Centre. Barcelona
- Geriatric Centre. Altafulla
- Guadix Golf Resort
- Holiday Resort. Algeria
- Horse racecourt. Maia
- Hotel Extension Platja d'Aro
- Hotel Resort. Guadix
- Hotel resort. Ibiza
- Hotel resort. Teià
- Houses. Arcos de la Frontera.
- La Romera Residential Resort
- Leisure Center. Kiev
- Life resort Fornells de la Selva
- Marina Hemingway
- Marina. Panama
- Master Plan Altos de Batele
- Master Plan. Cabo Santos
- Master Plan.Peralada
- Masterplan LUMINE
- Mountain Resort
- Nautic Park. Panama
- New resort. Canillo
- Oued Chbika Masterplan, Morocco
- Pool.Girona
- Port Valencia Nord Competition
- Preliminary Study for the building of a Housing Development Villa Palomeras. Málaga
- Punta Duarte residential and tourist resort, Panama
- Racing Circuit. St. Pere Ribes
- Resort Baishan, China
- Resort Playa Mujeres
- Resort in Mexico
- Resort. Algeria
- Resort. Algeria
- Resort. Mexico
- Resort. Portugal
- Resort. Skikda
- Resort. Ucrania
- San Lorenzo. Panama
- Sherman. Panamá
- Silicon Guadix: Park - Public Facility in Guadix
- Technological Park. Peralada
- Teià Masterplan
- The lodge Raimat.
- Three-satr Resort
- Tourist Village. Skikda
- Touristic Complex Aznalcázar
Public tender for the adaptation and operation, under an administrative concession, of the marina facilities in the northern area of the port of Valencia
The competition is part of a large-scale transformative vision, a strategy that seeks to better connect the city with the seafront, improve the city-port relationship, incorporating the marina into the city.
In this sense, other large-scale transformative projects are being developed in the area around the marina: the Desembocadura (Estuary) Park and the reconversion of the area of the old train station at Grao and the Formula 1 circuit into a new neighbourhood, right next to the marina (PAI del Grao).
7 areas of opportunity have been identified. For each of them, 2 types of actions are proposed: internal and external.
The internal interventions are designed to provide local service, to improve the operation of the marina, its accessibility or internal connection.
The external, general or higher-impact actions represent proposals in a global sense, meant to improve the connection with the city, to attract new visitors by diversifying the uses and attractions of the marina.
The overall vision is that of a green, attractive and integrated marina, a new urban polarity.
In this sense, other large-scale transformative projects are being developed in the area around the marina: the Desembocadura (Estuary) Park and the reconversion of the area of the old train station at Grao and the Formula 1 circuit into a new neighbourhood, right next to the marina (PAI del Grao).
7 areas of opportunity have been identified. For each of them, 2 types of actions are proposed: internal and external.
The internal interventions are designed to provide local service, to improve the operation of the marina, its accessibility or internal connection.
The external, general or higher-impact actions represent proposals in a global sense, meant to improve the connection with the city, to attract new visitors by diversifying the uses and attractions of the marina.
The overall vision is that of a green, attractive and integrated marina, a new urban polarity.
Location: Port of Valencia
Year: 2024
Client: Port Authority of Valencia
Area: 68.65Ha
Year: 2024
Client: Port Authority of Valencia
Area: 68.65Ha