Jordi Marcè
cronology
- 1 house. Altafulla
- 1 house. Campins
- 1 house. Castellterçol
- 1 house. Corçà
- 1 house. Esplugues
- 1 house. Ferran
- 1 house. Foixà
- 1 house. Fornells
- 1 house. La Pobla
- 1 house. Lliçà d'Amunt
- 1 house. Lliçà d'Amunt
- 1 house. Teià
- 1 house. Teià II
- 1 house. Tortosa
- 1 house. Ullastrell
- 1 house. Vallromanes
- 1 house. Vallvidrera
- 1 House. L'Escala
- 1 House. Lleida
- 1 house. Matosinhos
- 9 Houses
- Alt Penedès 25 Houses
- Bonanova 7 Houses.
- Can Munt 8 Houses.
- Cap Martinet 8 houses.
- Collsabadell - Llinars del Vallès 9 single-family homes
- Flat house: housing Golf Barcelona / Masia Bach
- Girona 11 Houses
- Girona 11 Single-family Houses
- Golf Peralada 5 Single Family Homes
- Hotel. ibiza
- House at Boulakroud. Algeria
- Housing in Peralada
- Ibiza 32 single family houses.
- L'Ametlla de Mar. 27 Houses.
- La Floresta 3 houses.
- Lleida 5 single-family homes
- Llinars del Vallés 9 Houses
- Malaga 29 Houses
- Masia Bach Phase 1: 4 housing units
- Masia Bach Phase 2: 5 housing units
- Masia Bach Phase 3: 3 housing units
- Masia Bach Phase 4: 4 housing units
- Modular house: housing Golf Barcelona / Masia Bach
- PAU 16 Calonge Housing
- PAU-19 Housing Complex
- PAU-19 Housing Types
- Peralada - preliminary study 5 homes
- Peralada 4 Houses
- Riera de Gaià 2 houses.
- Single Family Hose. Gerona
- Tarragona preliminary study - 2 housing units
- Teià Eco-homes
Eco-homes in the Can Barrera – Sant Berger Oest area, Teià. Preliminary study
As part of the process of drawing up the new Teià Urban Development Plan, a project has been presented for the area between Can Barrera and Sant Berger, with proposals to improve mobility between the center, north, and east of the municipality.
The planning proposal presented as part of the processing of the new POUM aims to organize the area that currently separates the center of Teià and the Can Barrera area from the Sant Berger urbanization, as an area for facilities, green spaces, subsidized housing, and a residential complex of eco-homes.
The overall concept is an area connected by a network of new roads, greenways, and pedestrian paths.
The proposal includes an urban green area equipped with spaces for sports and leisure activities, rest areas, and services, enhanced by pergolas, benches, points of interest and viewpoints.
The planning proposal presented as part of the processing of the new POUM aims to organize the area that currently separates the center of Teià and the Can Barrera area from the Sant Berger urbanization, as an area for facilities, green spaces, subsidized housing, and a residential complex of eco-homes.
The overall concept is an area connected by a network of new roads, greenways, and pedestrian paths.
The proposal includes an urban green area equipped with spaces for sports and leisure activities, rest areas, and services, enhanced by pergolas, benches, points of interest and viewpoints.
Location: Teia, Barcelona
Year: 2025
Client: Teià City Council / Private developer
Superfície: 10, 800 sqm
Year: 2025
Client: Teià City Council / Private developer
Superfície: 10, 800 sqm