Jordi Marcè
cronology

Public parking and new road system in Teià, between Can Barrera and Sant Berger. Preliminary study

Within the framework of the new Comprehensive Plan of Teià, various proposals for the improvement and sustainable growth of the urban center have been presented. One of these aims to connect the center of Teià, through the Can Barrera area, with the facilities area and the Sant Berger housing development. The project involves developing an area west of the Sant Berger stream, up to the Doctor Barrera stream.
The overall concept is that of an area that connects the old town of Teià with the Sant Berger development and the Serralada Litoral park, with a network of new roads, greenways and pedestrian paths.
In parallel, aiming to encourage non-motorized travel along the new routes, two public parking areas are proposed, one at each end of the area. The first parking lot, with 50 spaces, located in Can Barrera, is planned next to the new social housing development. The second, with 100 spaces, is located in Torrent de Sant Berger, next to the new pavilion that will complete the sports center. The two parking areas will be of the park-parking type, with trees, low vegetation and draining pavements (green parking lots).
Location: Teià, Barcelona
Year: 2025
Client: Teià City Council
Area: 11 Ha