Urbanization. Sector PP5 L'hort d'en Pau. Altafulla, Tarragona.

The project tries to reinforce the road next to the elevated road train, which is the access to the sector from the N-340 main road. The proposal also improves the Mar Street as an important road joint with the public equipment area like the train station entry.

At the south end of the project area we establish a new street with width and forest sidewalks, which follows east-west directions, parallel to the train rails and going along with the forest park, keeping away the train presence and noise pollution. In the northwest limit there is a camping area where is planed the extension of the road until the N-340 main road connecting finally with the AP-7 highway.
Client: Junta de Compensació PP5.
Situation: Sector PP5 Altafulla, Tarragona.
Total Area: 8.6 Ha
Year: 2004